page title icon Winoa Ibérica’s steel abrasives manufacturing plant in Balmaseda

PROCUREMENT MANAGEMENT, MANAGEMENT AND COORDINATION OF WORKS AND RELOCATION OF EQUIPMENT

Purchasing management, direction and coordination of works and relocation of equipment for the new steel abrasives shot plant of Winoa Ibérica S.A. in Balmaseda (Bizkaia).

Client: Winoa Ibérica S.A.
Location: Arla Industrial Park in Balmaseda


Plot surface: 28.927,54 m2
Buil-up surface: 10.875 m2
Budget: 20.000.000 €
Link: www.winoagroup.com

Project details

Maratek carries out the works management and coordination of an industrial building (consisting of 4 warehouses with PB+I), a two-storey administrative building (PB+I) and several annexed buildings and facilities, together with the development of the rest of the plot.

At the same time, it manages the construction of the water catchment in the Kadagua River and the pump house to ensure the supply of water for industrial use in the new plant.

Information about the facilities

The plant occupies an area of about 30,000 square metres and consists of four floors. It integrates induction and heat treatment furnaces, screening stations and conveyor belts for abrasives steel storage and packaging. In addition, the auxiliary facilities incorporate state-of-the-art technology for water control and air treatment.

This is the group’s main investment in the last five years and has resulted in the most avant-garde steel shot factory in the sector. In addition to improving productivity, two of the company’s stated objectives are to achieve a zero accident rate and to have a minimum environmental impact.